Pipelay vessel Seminole during HHTP project — offshore Israeli waters
PLEM HOT-TAP LANDFALL TIE-IN
Selected Project Experience

Hadera Hot-Tap Pipeline.

A 24" offshore gas pipeline tied into Israel's existing 30" national transmission system via hot-tap, PLEM, and rigid spool arrangement. Onsite project management and local execution support across the full onshore execution chain.

Project location
Hadera, Israel
Offshore / Onshore Integrated Execution
Pipeline length
5.35km
Pipeline size
24"
Connection
30"
Live transmission tie-in
Phases supported
5/5
Continuous involvement
Method
Hot-tap
+ HDD landfall
01

Project overview

A strategic offshore-to-onshore gas infrastructure project tied into Israel's national transmission system.

The Hadera Hot-Tap Pipeline (HHTP) project connects a new 24" offshore pipeline of approximately 5.35 km to an existing 30" offshore gas transmission line via a hot-tap connection, PLEM (Pipeline End Manifold), and rigid spool arrangement. The pipeline lands at Hadera through a trenchless landfall crossing and connects onshore toward existing infrastructure.

The project combines offshore pipeline installation, hot-tap interface works on a live national gas transmission line, trenchless shore crossing, onshore pull-in operations, and pipeline pre-commissioning — executed by a multi-national contractor team operating within Israel's regulatory and operational environment.

The technical scope itself is mature offshore practice. What makes the project demanding is execution synchronization: interface density, sequence dependency, and continuity across multiple phases and contractor scopes operating simultaneously.

Hadera onshore worksite — HHTP project, offshore pipeline preparation

Hadera onshore worksite — operational base for the offshore campaign

02

Role of A&S Global

Onsite project management and local execution coordination across the full onshore execution chain.

Project Continuity

Project involvement began through Maagan, where A&S Global's founder served as Project Manager across early execution phases — site establishment, HDD landfall works, onshore pipeline welding, the onshore pull-in operation, and the subsequent offshore support and tie-in activities.

Engagement with A&S Global directly began at the pre-commissioning stage of the project — built on site knowledge, established contractor relationships, and continuity carried forward from the earlier phases.

Function
Project Manager / onsite local execution coordinator
Engaged through
Maagan — Israeli local support contractor to Micoperi
Phases involved
Site setup → HDD → welding → pull-in → pre-commissioning
Working with
Micoperi in-country PM and specialist subcontractors
03

Execution phases

Five phases — one continuous involvement.

Phase 01

Site Establishment & Worksite Operations

Setup and ongoing coordination of the Hadera onshore worksite that served as the operational base for the offshore installation campaign and associated subcontractors.

Site coordination, local execution support, logistics interfaces, contractor support, operational continuity, and worksite readiness throughout the campaign.

Phase 02

HDD & Landfall Support

Trenchless landfall crossing executed by A-Hak. Local site coordination, contractor support, and interface management between the offshore pipeline works, the landfall area, and the onshore worksite.

Specialist contractor — A-Hak
Landfall crossing structure extending to sea
Phase 03

Onshore Pipeline Welding

Onshore pipeline welding spread executed by Real Engineering. Site-level coordination and interface support between the welding contractor, local support teams, and broader project operations — bridging the HDD exit, onshore facilities, and tie-in readiness for later commissioning.

Specialist contractor — Real Engineering Ltd.
Phase 04

Onshore Pull-In Operation

Pipeline pulled to shore directly from the pipelay vessel Seminole — a continuous integrated marine-to-shore operation rather than a separated installation and pull sequence. Onshore-side coordination connecting the offshore marine operation with the onshore worksite and HDD exit interface.

One of the highest-interface-density moments of the project — weather, tension management, alignment tolerances, and contractor synchronization all converging within a narrow operational window.

Hadera worksite aerial view — offshore installation campaign in progress
Phase 05
Upcoming

Pre-Commissioning Support

Pipeline pre-commissioning works planned within the project — flooding, cleaning, gauging, hydrotesting, dewatering, drying, and nitrogen preservation. Onsite coordination, contractor interfaces, and local execution continuity.

Pre-commissioning scope is scheduled for execution and will follow the completion of preceding offshore activities.
04

Project participants

Multi-national contractor team operating across offshore and onshore scopes.

Israel Natural Gas Lines
Client
Project owner and operator of Israel's high-pressure gas transmission system.
Micoperi S.r.l.
Main Contractor
Offshore EPC and marine integrator awarded the HHTP execution package.
Maagan
Local Support Contractor
Israeli operational and logistics backbone supporting Micoperi and all foreign subcontractors at the Hadera worksite.
A-Hak
HDD Contractor
Trenchless landfall crossing — Dutch HDD specialist.
Real Engineering Ltd.
Welding Contractor
Onshore pipeline welding, NDT coordination, and tie-in readiness.
Pre-commissioning contractor
Upcoming phase
Flooding, gauging, hydrotesting, dewatering, drying, and nitrogen preservation — to be engaged for the pre-commissioning phase.
Seminole
Pipelay Vessel
Offshore pipeline installation and direct pull-in execution.
05

Value delivered

Continuity, contractor familiarity, and practical site knowledge.

In multi-contractor offshore projects, the most common failure mode is interface breakdown between phases — “nobody remembers why this was done,” “that was another contractor,” “design doesn't match field reality.” Continuity across the execution chain is what closes those gaps.

i.

Execution Continuity

Single point of project knowledge spanning early site works through pre-commissioning — a perspective rarely held by any other party on the project.

ii.

Contractor Coordination

Established working relationships across all major project participants — international main contractor, specialist subcontractors, and the local support contractor.

iii.

Site Knowledge

Practical understanding of buried infrastructure realities, as-built conditions, unresolved field issues, and how the worksite evolved across phases.

iv.

Interface Management

Practical bridging between international project execution standards and the local operational realities of working in Israel — Hebrew-language interfaces, local authorities, and supply chain depth.

In closing

Practical project management. Local coordination. Hands-on execution.

The HHTP project reflects A&S Global's approach to complex infrastructure execution in Israel — bridging the gap between international project requirements and local execution realities, from worksite setup through onshore pull-in and pre-commissioning support.

Project participation acknowledged with prior consent of the contracting parties. Project-sensitive technical details, drawings, and contractual information remain confidential.